door scheduling
You choose the design; We handle the rest
Planning door hardware across a full project moves fast: dozens of doors, each needing the right handle, lock, hinge, and finish, all coordinated before the first installation begins. Send us your floor plans, and we'll deliver a complete door hardware schedule, mapped door by door, so nothing gets missed or mismatched on site.
what we offer
Whether it's a small renovation or a major commercial build, every schedule is checked for:
- Building Code of Australia compliance
- Fire-rated doors and hardware
- Egress requirements
- Accessibility
- Interconnecting doors
- Electric strikes
- Restricted master and grand master keying
- Construction keying
- Door closer requirements
how it works
We take your floor plans and door elevations, interpret the functional requirements, and deliver a comprehensive schedule, so you can focus on what you do best: the design.
1. Browse our collections or bespoke projects
2. Email your floor plans and door elevations
3. Our team will review and resolve RFIs
4. Receive your schedule and quote
Please note that this is a complimentary service we offer for architects, interior designers, and builders. Our way of supporting your project from the planning stage, not just the specification one
know how the door works; check the rules
1. Door and frame material, thickness, handing, hinge type, and transom location, plus the security level each opening needs. These decide the locks, latches, closers, hinges, and keying.
2. Flag any doors that need fire-rated hardware, accessible hardware, or a specific egress function.
match style & details; complete the function
3. Pick a handle family and finish that suits the architecture, then carry it through so every room feels consistent.
4. Add locks, latches, hinges, door stops, privacy turns and escutcheons.
specified to code
Scheduling and specifications go together. Our team examines your building plans and completes the product specifications, so every selection meets the National Construction Code and fire rating requirements while suiting your design and budget. Along the way, we resolve:
1. Building code compliance
2. Fire rating
3. Egress requirements
4. Interconnecting doors
5. Electric strikes